Question: The mean processing time ( x ) of a job on a machine is 1 1 minutes with a standard deviation ( ) of 0

The mean processing time (x) of a job on a machine is 11 minutes with a standard deviation () of 0.23 minutes. Upper specification limit (USL) is 11.5 minutes, whereas lower specification limit (LSL) is 10.5 minutes. What is the process capability ratio (cp) for this process? Is the process capable?
Cp=0.72, capable
Cp=1.5, capable
Cp=1, not capable
Cp=0.72, not capable
Cp=1, capable