Question: The network below represents a project being analyzed by the critical path method. Activity durations (included in below network) are A=5 days, B=2days,C=12days, D=3 days,


The network below represents a project being analyzed by the critical path method. Activity durations (included in below network) are A=5 days, B=2days,C=12days, D=3 days, E=5 days, F=1 day, G=7 days, H=2 days, I=10 days, and J=6 days. I. Identify all activities that are part of the critical path(s) of this network. The letter associated with the correct answer is a) A-C-D-H-J b) A-B-G-I-J c) A-B-E-H-J d) C-D-E-F-H e) None of the above II. What is the length of the critical path, that is the total project duration time? The letter associated with the correct answer is a) 28 days b) 30 days c) 32 days d) 34 days e) None of the above III. What is the slack associated with activity F? The letter associated with the correct answer is a) 0 b) 2 c) 5 d) 10 e) None of the above IV. If activity G were delayed by two days, what would be the total project duration time? The letter associated with the correct answer is a) 28 days b) 30 days c) 32 days d) 34 days e) None of the above
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts