Question: The normal time for a work cycle in a worker - machine system is 6 . 2 7 min. For setting the standard time, the

The normal time for a work cycle in a worker-machine system is 6.27 min. For setting the standard time, the PFD allowance factor is 12%, and the machine allowance factor is 25%. The work cycle includes manual elements totaling a normal time of 5.92 min, all but 0.65 min of which are performed as internal elements. Determine
(a) The standard time for the cycle
Machine time per cycle in minutes Tm=Answer
Internal normal time in minutes Tnwi=Answer
Standard time in minutes Tstd=Answer
(b) The daily output at standard performance.
Daily units produced in pieces Qstd