Question: The normal time to perform a repetitive manual assembly task is 4.25min. In addition, an irregular work element y normal time is 1.75min must be

The normal time to perform a repetitive manual

The normal time to perform a repetitive manual assembly task is 4.25min. In addition, an irregular work element y normal time is 1.75min must be performed every 8 cycles. The PFD allowance factor is 16%. Determine the follov If a semiautomatic machine cycle of 2min. is added to the system (machine allowance =40% ), what will be time in this case? a. None b. 6.47min c. 7.2min d. 6.5min e. 8min