Question: The problem needs to be completed in excel A time study was conducted on a job that contains four elements. The observed times and performance

The problem needs to be completed in excel A time
The problem needs to be completed in excel
A time study was conducted on a job that contains four elements. The observed times and performance ratings for seven cycles are shown in the following table. ARSFRVATINNC Iminutse narmiald Required: (rounded to two decimal places): a. Determine the average cycle time for each element. b. Compute the normal time for each element. c. Assuming the allowance factor of 15% of job time, compute the standard time for each element