Question: The processor designer was able to make ALU 25% faster implying that the new CPI for ALU is 0.75*old CPI for ALU. What is the

The processor designer was able to make ALU 25% faster implying that the new CPI for ALU is 0.75*old CPI for ALU. What is the execution time of the program in Problem 1 on this improved processor?

(Problem 1 Reference)

Consider a processor running at 2GHz with the following CPI values:

ALU: 1.12; Memory: 1.2; Control: 1.4

A program with a loop with a loop body of 250 instructions iterated 100 times, and the following instructions mix for the program (ALU- 35%; Memory- 35%; Control- 30%)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer