Question: The production capacity can be modified by: ( 1) subcontracting (2) adding equipments ( 3) adding shifts ( 4) All of the above

 The production capacity can be modified by: ( 1) subcontracting (2)

The production capacity can be modified by: ( 1) subcontracting (2) adding equipments ( 3) adding shifts ( 4) All of the above