Question: the Q is complete 2 machine and 1 operator Loading: 1 min Machine automated operating time: 12 min Traveling time: 1 min Unloading: 1 min
2 machine and 1 operator Loading: 1 min Machine automated operating time: 12 min Traveling time: 1 min Unloading: 1 min Inspecting and Packing: 1 min . a) Construct a multiple activity chart. b) What is the transient time? c) Determine the cycle length (cycle time). d) Determine machine idle time during a repeating cycle e) Determine operator idle time during a repeating cycle f) Determine ideal machine assignment g) Calculate if you assign nearest integer number of machines that is greater than ideal h) Calculate if you assign nearest integer number of machines that is less than ideal i) Compare costs and what would be your recommendation