Question: The time - phased net requirements for the base assembly in a table lamp over the next six weeks are: table [ [ Week
The timephased net requirements for the base assembly in a table lamp over the next six weeks are:
tableWeekRequirements
a Determine the lot sizes using the Silver Meal heuristic.
b Compare the holding and setup costs obtained over the six periods using the SilverMeal heuristic with the cost of a lot for lot policy