Question: The values for direct cost? The value for indirect cost ? Total Cost? Time? at the optimal cost-time point are (enter the values for DC,

The values for direct cost?
The value for indirect cost ?
Total Cost?
Time? at the optimal cost-time point are (enter the values for DC, IC, TC and OT):
5. Use the information contained below to compress one time unit per move using the least cost method. Assume the total indirect cost for the project is $700 and there is a savings of $50 per time unit reduced. Record the total direct, indirect, and project costs for each duration. What is the optimum cost-time schedule for the project? What is the cost? Note: The correct normal project duration and total direct cost are provided. Crash Cost (Slope) Maximum Crash Time Normal Time Normal Cost A 0 2 100 100 3 Act. B C 5 G D 40 60 20 40 1 1 2 1 1 0 Nu w WN 200 200 200 200 150 150 B D 3 3 Project duration 14 A 2x E G 5 2x 5 F Total direct cost 1.200 4
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock