Question: There are 3 work stations ( WC ) with the following capacity: WC 1 ( 2 , 0 0 0 units ) , WC 2
There are work stations WC with the following capacity: WC units WC units and WC units While the load could be shifted from WC to WC and also in the opposite direction, WCs load cannot be shifted to other WCs as a result of specialized equipment. In the following load situation, what is not a good solution?
WC: units, WC: units, WC: units
Group of answer choices
Subcontracting
Increasing the efficiency of the operation
Pushing work back
Rerouting work to another work center
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
