Question: There are 7 tasks and 5 observations for each tasks. If the observation value is 5 0 % more than the mean of this tasks,

There are 7 tasks and 5 observations for each tasks. If the observation value is 50% more than the mean of this tasks, that observation is eliminated and rest of the observations will be used.
Table 1. Observed times for the given process
Cycle no:
Element Number
and Description
1
2
3
4
5
Performance Rates (%)
1
13
12
14
13
13
100
2
25
22
23
24
25
3
66
66
62
67
60
4
15
13
15
15
110
5
30
30
25
22
20
6
20
20
25
24
22
90
7
30
32
94
35
32
80
a. Calculate the number of sample sizes for work element-1 and work element-2. Is the number
of observations enough for each work element? (10 points)
(40 VnEx2-(Ex
where
1
Ex
sample size we wish to determine
-number of readings taken in the preliminary study -sum of values
= value of the readings.
b. Calculate the total allowance rate using the following table. Assume that the following situation is observed by the method engineer: "Average" skill, "Good" Efforts, "ideal" condition, and "Excellent" consistency. (5 points)
Shill
+0.15 A
+0.13 A
Superskill
Effort +0.13 A +0.12 A
Excessive
+0.118
+0.10 B
+0.08 B
Excellent
+0.08 B
Excellent
+0.06 C
+0.00 C
+0.03 C +0.00 D
Good
+0.02 C
Good
Averag
+0.00 D
-0.05,
-0.041
-0.10 E
Fair
-0.08
Average Fair
-0.16 F
-0.22
Por
-0.12 P -0.17 F
Pr
Conditions
Consistency
+0.06 A +0.04 B
Ideal
+0.04 A
Perfect
Excellent
+0.03 B
Excellent
19
0
TUR
13:08
24.04.2024

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!