Question: HeneThere are 7 tasks and 5 observations for each tasks. If the observation value is 5 0 % more than the mean of this tasks,
HeneThere are tasks and observations for each tasks. If the observation value is more than the mean of this tasks, that observation is eliminated and rest of the observations will be used.
Table Observed times for the given process
Cycle no:
Element Number
and Description
Performance Rates
a Calculate the number of sample sizes for work element and work element Is the number
of observations enough for each work element? points
VnExEx
where
Ex
sample size we wish to determine
number of readings taken in the preliminary study sum of values
value of the readings.
b Calculate the total allowance rate using the following table. Assume that the following situation is observed by the method engineer: "Average" skill, "Good" Efforts, "ideal" condition, and "Excellent" consistency. points
Shill
A
A
Superskill
Effort A A
Excessive
B
B
Excellent
B
Excellent
C
C
C D
Good
C
Good
Averag
D
E
Fair
Average Fair
F
Por
P F
Pr
Conditions
Consistency
A B
Ideal
A
Perfect
Excellent
B
Excellent
TUR
:
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock