Question: There is a single machine, with an average effective process time of 30 minutes per job. The arrival rate is 1.8 jobs per hour. The
There is a single machine, with an average effective process time of 30 minutes per job. The arrival rate is 1.8 jobs per hour. The SCV of arrivals is equal to 1 and the SCV of effective process time is also equal to 1. Between the two stations is a buffer that can hold at most 10 jobs. a) Model Station 2 as a Blocked Queue. i. What is the "utilization" at station 2? ii. What is the station WIP? iii. What is the station throughput? iv. What is the station cycle time? u= WIP = TH =
Step by Step Solution
There are 3 Steps involved in it