Question: This is the entire problem The controller for Wolfe Machining has established the following overhead cost pools and cost drivers: Order no. 715 has the
This is the entire problem
The controller for Wolfe Machining has established the following overhead cost pools and cost drivers:
Order no. 715 has the following production requirements:
Machine setups: 5 Units of Raw material: 1,000 units Inspections: 4 Machine hours: 500
Assume also that direct material for order no 715 is $20,000 and direct labor is $12,000.
Required:
A. Calculate the 4 different pool rates using the table information above.
B. Compute the total overhead that should be assigned to order no. 715 by using activity-based costing.
C. Compute the total cost assigned to the order.
D. Which of the two methods (traditional or ABC) is more accurate? Why?