Question: This is the same information as above. please conduct MRP (Material Requirements Planning) under Lot-size ordering with a lot size of 90 units for frames

This is the same information as above. please conduct MRP (Material RequirementsThis is the same information as above. please conduct MRP (Material Requirements Planning) under Lot-size ordering with a lot size of 90 units for frames and 75 units for wood sections.

Note: Please include excel formulas for thumbs up. Thank you

  • Each shutter consists of three slatted wood sections and two frames
  • A firm that produces wood shutters has received two orders: one for 150 shutters (week 5) and one for 180 shutters (week 9)
  • The wood sections are made by the firm, and fabrication takes 2 weeks
  • The frames are ordered, and lead time is 1 week
  • Assembly of the shutters requires 1 week
There is a scheduled receipt of 85 wood sections in (i.e., at the beginning of) week 1.

X K12 Name Box B D E F G H 1 J K L M N O 1 1 2 4 5 6 7 8 9 Week Number Quantity 2 Master Schedule 150 180 3 4 Shutter 150 180 5 6 1 1 Gross requirements Scheduled receipts Projected on hand Net requirements Planned-order receipts Planned-order releases Quantity = LT = Lot Size = On hand - 7 8 9 150 150 180 180 150 180 10 Frames 300 11 12 2 13 14 15 16 Quantity - LT = Lot Size = On hand = Gross requirements Scheduled receipts Projected on hand Net requirements Planned-order receipts Planned-order releases 1 90 17 18 Wood Section 19 20 21 22 23 Quantity = LT = Lot Size = On hand = 4 2 75 Gross requirements Scheduled receipts Projected on hand Net requirements Planned-order receipts Planned-order releases 24 Sheet1 + X K12 Name Box B D E F G H 1 J K L M N O 1 1 2 4 5 6 7 8 9 Week Number Quantity 2 Master Schedule 150 180 3 4 Shutter 150 180 5 6 1 1 Gross requirements Scheduled receipts Projected on hand Net requirements Planned-order receipts Planned-order releases Quantity = LT = Lot Size = On hand - 7 8 9 150 150 180 180 150 180 10 Frames 300 11 12 2 13 14 15 16 Quantity - LT = Lot Size = On hand = Gross requirements Scheduled receipts Projected on hand Net requirements Planned-order receipts Planned-order releases 1 90 17 18 Wood Section 19 20 21 22 23 Quantity = LT = Lot Size = On hand = 4 2 75 Gross requirements Scheduled receipts Projected on hand Net requirements Planned-order receipts Planned-order releases 24 Sheet1 +

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Finance Questions!