Question: This is the same information as above, please conduct MRP (Material Requirements Planning) under Lot-size ordering with a lot size of 90 units for frames

This is the same information as above, pleaseThis is the same information as above, please

This is the same information as above, please conduct MRP (Material Requirements Planning) under Lot-size ordering with a lot size of 90 units for frames and 75 units for wood sections. Each shutter consists of three slatted wood sections and two frames A firm that produces wood shutters has received two orders: one for 150 shutters (week 5) and one for 180 shutters (week 9) The wood sections are made by the firm, and fabrication takes 2 weeks The frames are ordered, and lead time is 1 week Assembly of the shutters requires 1 week There is a scheduled receipt of 85 wood sections in (i.e., at the beginning of) week 1. 1 2 3 4 6 7 8 9 Week Number Quantity 5 150 Master Schedule 180 Shutter Quantity 1 1 Gross requirements Scheduled receipts Projected on hand Net requirements Planned-order receipts Planned-order releases LT- Lot Size On hand- Frames 2 Gross requirements Scheduled receipts Projected on hand Net requirements Planned-order receipts Planned-order releases Quantity LT = Lot Size On hand = 1 Wood Section 4 2 Quantity LT = Lot Size = On hand Gross requirements Scheduled receipts Projected on hand Net requirements Planned-order receipts Planned-order releases

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!