Question: this question is in project control are available for a following information Construction project in days, All durations are Activity Intermediate predecessor optimistic Most likely

this question is in project control are available

this question is in project control

are available for a following information Construction project in days, All durations are Activity Intermediate predecessor optimistic Most likely Pessimistic ture Type Time time 1 time t 2. a 5 4 7 5 - 6 3 5 14 4 1 2. 4 A 3. 4 2 O 4 3 G 3 4 7 3 2 7 3 4 4 G 3 6 2 B, DF 2 2 @ Draw the project network and find the Critical path. (b) Resouoce the peofoom Allocation if maximum unite of resource of TYPE 1 and TYPE 2 available are lo 15 respectively, 2 and

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!