Question: this question is in project control are available for a following information Construction project in days, All durations are Activity Intermediate predecessor optimistic Most likely

this question is in project control
are available for a following information Construction project in days, All durations are Activity Intermediate predecessor optimistic Most likely Pessimistic ture Type Time time 1 time t 2. a 5 4 7 5 - 6 3 5 14 4 1 2. 4 A 3. 4 2 O 4 3 G 3 4 7 3 2 7 3 4 4 G 3 6 2 B, DF 2 2 @ Draw the project network and find the Critical path. (b) Resouoce the peofoom Allocation if maximum unite of resource of TYPE 1 and TYPE 2 available are lo 15 respectively, 2 andStep by Step Solution