Question: Three jobs, A , B , and C , are processed in batches in a manufacturing facility with 3 machines: M 1 , M 2
Three jobs, A B and C are processed in batches in a manufacturing facility with machines: M M and M The total number of jobs of type A is that of type B is and that of type C is The sequence of operations on the jobs are as follows:
Job A: MMM
Job B: MMM
Job C: MMM
Machine M has been identified as the bottleneck machine, and the processing schedule on Machine M reads as follows the beginning and ending time of processing of the entire batch in minutes are given:
Job C: to
Job B: to
Job A: to
If a Drum buffer of minutes is introduced before M and if the transfer batch of job B is the processing of job B on Machine M should start at least by the th minute to ensure that the schedule on the bottleneck machine is followed promptly. Note that the processing time for job B on Machine M is minutes per job, and assume that no shipping buffer is present.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock