Question: Three physically identical synchronous generators are operating in parallel. They are all rated for a full load of 3 MW at 0 . 8 PF
Three physically identical synchronous generators are operating in parallel. They are all rated
for a full load of MW at PF lagging. The noload frequency of generator A is Hz and
its speed droop is percent. The noload frequency of generator B is Hz and its speed
droop is percent. The noload frequency of generator C is Hz and its speed droop is
percent.
a If a total load consisting of MW is being supplied by this power system, what will the
system frequency be and how will the power be shared among the three generators?
b At what load does one of the generators reach to noload condition? Which generator
reaches to noload condition first?
c At what load does one of the generators exceed its ratings? Which generator exceeds its
ratings first?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock