Question: Time Estimates Activity Optimistic (a) Most Likely (m) Pessimistic (b) Activity Statistics Expected Time (Te) Variance (02) ABCDE 5 8 11 8.00 1 4
Time Estimates Activity Optimistic (a) Most Likely (m) Pessimistic (b) Activity Statistics Expected Time (Te) Variance (02) ABCDE 5 8 11 8.00 1 4 8 11 7.83 1.36 5 6 7 6.00 0.11 2 4 6 4.00 0.44 4 7 10 7.00 1 TOTAL 32.83 3.91 a+4m+b t = 6 2 = (b = a) T-TE