Question: Time left 1 : 1 6 : 4 5 An x - bar control chart was examined and no data points fell outside of the

Time left 1:16:45
An x-bar control chart was examined and no data points fell outside of the limits. Can this process be considered in control?
Select one:
a. Not yet, the R-chart must be checked.
b. Not yet, the number of samples must be known.
c. Not yet, there could be a pattern to the points.
d. Both Not yet, there could be a pattern to the points and Not yet, the R-chart must be checked
e. Yes.
 Time left 1:16:45 An x-bar control chart was examined and no