Question: Time required for the robot to complete an assembly is always exactly 100 minutes, Expected mean time between failures is 500 minutes Expected mean time

Time required for the robot to complete an
Time required for the robot to complete an assembly is always exactly 100 minutes, Expected mean time between failures is 500 minutes Expected mean time between repairs is on average 5 minutes with a standard deviation of 3 minutes The CV of job inter-arrival times into the system is 1, Average throughput is 10 parts per day. The robot operates 24 hours a day, Provide values for the following parameters (assume that the r ice is system) 1) Availability (A) of the robot 2 G 4) Utilization (s) of the robot 5 CT, 6) CT 7) WIP 8) WIP

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!