Question: topic: construction mangement need help drawing the table and questions. 13. Draw the network and complete the table below:HW 4 - How long is the


13. Draw the network and complete the table below:HW 4 - How long is the duration of the project? - What is the critical path (or paths)? - ( Total Float =LSES or LF EF) Predecessor (IPA) Duration ES A 10 B A 8 C A 6 D C 4 E C C G B 4 B 5 A, B 5 J E 5 K F 5 L G 3 M J 3 0 L, H 1 P D, K 5 Q O 2 R P 3 S Q, R, I 8 T S, M 6