Question: Topic: Learning Curve - Operation Management Instruction: The operator has to assembly the robot 10 times and the analyst must study the time that the

Topic: Learning Curve - Operation Management
Topic: Learning Curve - Operation Management Instruction: The operator has to assembly the robot 10 times and the analyst must study the time that the operator takes to assemble the robot. Please I need the whole process. Operator 1: Observations Assembling time in (s) 1 48.46 2 51.53 357.11 4 1:04.62 5 56.13 6 57.69 7 58.50 8 51.84 9 54.10 10 1:02.43 Operator 2: Observations Assembling time in (s) 1 57.16 2 41.83 340.13 4 58.03 5 1:01.61 6 38.46 7 55.76 8 54.64 9 58.41 10 49.79 Question 1: Based on the collected data, what is the slope of the leaming curve? For both operators Please use formula: EXAMPLE Assume that it takes 20 min to produce the 50th unit and 15 min to produce the 100th unit. What is the leaming curve? log10 20 - log10 15 1.301 - 1.176 = -0.4152 Ax log10 50 - log10 100 1.699 -2.000 n === Question 2: What is the leaming rate of the operator? For both operators. Please use formula: EXAMPLE 2-0.4152 = 75%

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!