Question: Total Quality Management ( TQM ) emphasizes: a ) Reducing employee involvement b ) Increasing defects c ) Continuous improvement d ) Minimizing customer feedback

Total Quality Management
(
TQM
)
emphasizes: a
)
Reducing employee involvement b
)
Increasing defects c
)
Continuous improvement d
)
Minimizing customer feedback e
)
Maximizing rework
The
5
S methodology focuses on: a
)
Increasing waste b
)
Reducing process speed c
)
Improving workplace organization d
)
Maximizing defects e
)
Ignoring safety protocols
Which inventory management technique involves ordering a fixed quantity of items each time an order is placed? a
)
Economic Order Quantity
(
EOQ
)
b
)
Material Requirements Planning
(
MRP
)
c
)
Just
-
in
-
Time
(
JIT
)
d
)
ABC analysis e
)
Capacity planning
The critical path in a project network diagram represents: a
)
The shortest path through the project b
)
The longest path through the project c
)
The path with the most activities d
)
The path with the lowest cost e
)
The path with the least risk
What does the term "bottleneck" refer to in operations management? a
)
A type of product defect b
)
An area of excessive employee satisfaction c
)
A stage in a process that limits the overall capacity d
)
A type of employee training program e
)
A marketing strategy
Which production process focuses on producing unique, one
-
of
-
a
-
kind products? a
)
Mass production b
)
Batch production c
)
Job production d
)
Continuous production e
)
Repetitive production
The Six Sigma methodology aims to: a
)
Increase process variability b
)
Reduce process efficiency c
)
Minimize customer satisfaction d
)
Improve process quality by reducing defects e
)
Maximize lead times
Which forecasting method involves gathering opinions from multiple experts to make predictions? a
)
Time series analysis b
)
Delphi method c
)
Moving average d
)
Exponential smoothing e
)
Regression analysis
A Kanban system is used to: a
)
Maintain excess inventory b
)
Schedule employee vacations c
)
Regulate the flow of work in a process d
)
Automate quality control e
)
Forecast demand
What does the term "lead time" refer to in operations management? a
)
The time it takes for an employee to complete a task b
)
The time it takes to process customer complaints c
)
The time it takes to order and receive materials d
)
The time it takes to conduct employee training e
)
The time it takes to prepare financial reports
Which type of layout arranges workstations in a U
-
shape, allowing for flexibility and efficient communication? a
)
Process layout b
)
Product layout c
)
Cellular layout d
)
Fixed
-
position layout e
)
Line layout
Statistical Process Control
(
SPC
)
involves: a
)
Ignoring variations in processes b
)
Monitoring and controlling processes to maintain quality c
)
Maximizing production speed d
)
Eliminating all variations in processes e
)
Reducing employee involvement
Which quality management tool is used to identify the most significant issues in a process by plotting them on a graph? a
)
Control chart b
)
Ishikawa diagram
(
Fishbone diagram
)
c
)
Scatter plot d
)
Flowchart e
)
Histogram
In operations management, "capacity" refers to: a
)
The amount of money a company can make b
)
The number of employees in a company c
)
The maximum output a process can achieve in a given time d
)
The number of products in inventory e
)
The number of customer orders received
The Theory of Constraints
(
TOC
)
focuses on: a
)
Maximizing production without regard to efficiency b
)
Identifying and managing bottlenecks in processes c
)
Minimizing employee engagement d
)
Ignoring quality control measures e
)
Reducing customer satisfaction
Which type of inventory includes raw materials, components, and subassemblies? a
)
Finished goods inventory b
)
Work
-
in
-
progress inventory c
)
Safety stock inventory d
)
Cycle stock inventory e
)
Raw materials inventory
A Pareto chart is used to: a
)
Plot the flow of processes in a production line b
)
Display the distribution of defects in a process c
)
Organize employee training sessions d
)
Forecast future demand e
)
Calculate economic order quantity
The PDCA cycle
(
Plan
-
Do
-
Check
-
Act
)
is a continuous improvement framework introduced by: a
)
Frederick Taylor b
)
Peter Drucker c
)
Joseph Juran d
)
W
.
Edwards Deming e
)
Henry Ford
Which concept refers to the production of goods only when they are needed and in the quantities needed? a
)
Mass production b
)
Lean manufacturing c
)
Six Sigma d
)
Total Quality Management
(
TQM
)
e
)
Enterprise Resource Planning
(
ERP
)
Which type of inventory is held as a buffer to mitigate uncertainties in supply and demand? a
)
Cycle stock inventory b
)
Saf

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!