Question: Transfer case NUTS GER Figure 1. LS WORK ELEMENT MODAPTS TOTAL CODE MOD TIME (SEC) FREQ TOTAL TIME 1 TAKE 1 STEP TO CONTAINER OF

Transfer case NUTS GER Figure 1. LS WORK ELEMENT MODAPTS TOTAL CODE MOD TIME (SEC) FREQ TOTAL TIME 1 TAKE 1 STEP TO CONTAINER OF TRANSFER CASE NUTS 2 OBTAIN (SIMPLE GRASP) (2) NUTS FROM STOCK CONTAINER. WALK TO ENGINE. 3 TAKE 2 STEPS TO TRANSFER CASE ON ENGINE. 4 WORKING FROM LEFT SIDE OF THE ENGINE, POSITION (FEEDBACK NEEDED) AND BEGIN HAND START OF NUT TO CENTER LEFT STUD ON TRANSFER CASE TO TRANSMISSION. Page 2 of 3 2 5 FINISH HAND START NUT (3 ADDITIONAL TURNS) 6 MOVE FOREARM POSITION (FEEDBACK NEEDED) AND BEGIN HAND START OF NUT TO BOTTOM LEFT TRANSFER CASE STUD. 7 FINISH HAND STARTING NUT TO BOTTOM LEFT TRANSFER CASE NUT (3 ADDITIONAL TURNS) 8 RETURN TO START POINT (2 STEPS) 9 TAKE 1 STEP TO TOOL ON BALANCER (MOVE FORE ARM) 10 OBTAIN ELECTRIC TOOL. 11 STEP TO TRANSFER CASE ON ENGINE 12 POSITION (FEEDBACK NEEDED) ELECTRIC TOOL AND TIGHTEN 1ST NUT AT TOP LEFT POSITION. 13 MOVE FOREARM REPOSITION ELECTRIC TOOL AND TIGHTEN 2ND NUT AT MIDDLE LEFT POSITION. 14 ASIDE (MOVE WHOLE ARM) ELECTRIC TOOL TO BALANCER TOTAL TIME ALLOWANCE (10%) STANDARD TIME a) Complete the MODAPTS study 14 marks b) Categorize Value Added, None Value Added and Necessary None Vale Added activities (using yamazomi cart/ USE COLOR CODES TO MAKE THE BAR CHART) 6 marks c) How would you improve the work? Show the revised study with your proposed improvement. 10 m Transfer case NUTS GER Figure 1. LS WORK ELEMENT MODAPTS TOTAL CODE MOD TIME (SEC) FREQ TOTAL TIME 1 TAKE 1 STEP TO CONTAINER OF TRANSFER CASE NUTS 2 OBTAIN (SIMPLE GRASP) (2) NUTS FROM STOCK CONTAINER. WALK TO ENGINE. 3 TAKE 2 STEPS TO TRANSFER CASE ON ENGINE. 4 WORKING FROM LEFT SIDE OF THE ENGINE, POSITION (FEEDBACK NEEDED) AND BEGIN HAND START OF NUT TO CENTER LEFT STUD ON TRANSFER CASE TO TRANSMISSION. Page 2 of 3 2 5 FINISH HAND START NUT (3 ADDITIONAL TURNS) 6 MOVE FOREARM POSITION (FEEDBACK NEEDED) AND BEGIN HAND START OF NUT TO BOTTOM LEFT TRANSFER CASE STUD. 7 FINISH HAND STARTING NUT TO BOTTOM LEFT TRANSFER CASE NUT (3 ADDITIONAL TURNS) 8 RETURN TO START POINT (2 STEPS) 9 TAKE 1 STEP TO TOOL ON BALANCER (MOVE FORE ARM) 10 OBTAIN ELECTRIC TOOL. 11 STEP TO TRANSFER CASE ON ENGINE 12 POSITION (FEEDBACK NEEDED) ELECTRIC TOOL AND TIGHTEN 1ST NUT AT TOP LEFT POSITION. 13 MOVE FOREARM REPOSITION ELECTRIC TOOL AND TIGHTEN 2ND NUT AT MIDDLE LEFT POSITION. 14 ASIDE (MOVE WHOLE ARM) ELECTRIC TOOL TO BALANCER TOTAL TIME ALLOWANCE (10%) STANDARD TIME a) Complete the MODAPTS study 14 marks b) Categorize Value Added, None Value Added and Necessary None Vale Added activities (using yamazomi cart/ USE COLOR CODES TO MAKE THE BAR CHART) 6 marks c) How would you improve the work? Show the revised study with your proposed improvement. 10 m
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
