Question: TRUE OR FASLE ____________ (1) In JIT, 5S System includes selecting a fixed location for each item needed at the workstation but excludes separating the
TRUE OR FASLE
____________ (1) In JIT, 5S System includes selecting a fixed location for each item needed at the workstation but excludes separating the necessary items from the unnecessary items to be used at the work station.
____________ (2)Operational Takt Time should be larger than the Takt Time.
____________ (3) In lean systems, Kanban systemsshould be used instead of continuous flow whenever possible.
____________ (4) In VSM, Finished Goods Inventory is divided into Buffer Inventory (protects against variability and disturbances on the shop floor) and Safety Inventory (protects against variability in customer orders).
_____________ (5) In VSM, the pacemaker process is not always the last process in the manufacturing line.
____________ (6) In VSM, pitch indicates how much time each workstation should take in processing a part.
_____________ (7) In VSM, when one implements the improvements, kaizens are done first followed by kaikaku.
_____________ (8)Load-leveling box (Heijunka Box) should always be at the last operation at the end of the line.
______________ (9) In cellular manufacturing, counterclockwise flow is recommended for the flow of part in the work cell.
____________ (10) Takt Time excludesdown times, setup times and other disturbances at the work stations.