Turf-Rider, Inc., manufactures touring bikes and mountain bikes in a variety of frame sizes, colors, and...
Fantastic news! We've Found the answer you've been seeking!
Question:
Transcribed Image Text:
Turf-Rider, Inc., manufactures touring bikes and mountain bikes in a variety of frame sizes, colors, and component combinations. Identical bicycles are always produced at a batch size of 100 units. The projected demand, batch size, and time standards for each workstation are shown in the table below. Item Demand forecast Batch size Standard processing time Standard setup time Touring Bikes 5000 units/year 100 units 0.25 hours/unit/workstation 2.0 hours/batch/station Mountain Bikes 10000 units/year 100 units 0.5 hours/unit/workstation 3.0 hours/batch/station The shop currently works eight hours a day, five days a week, 50 weeks a year. It needs to decide at least how many workstations to procure so that they can meet the expected demand without using overtime. Assume that workstations work in parallel (which implies that each bicycle only needs to be worked by one workstation), and each workstation can produce one bicycle in the time shown in the table. Also assume that the stations need to be setup before producing a batch of either bike model. However, if the workstation cannot complete the production of the whole batch of one bike model by the end of the day, due to the eight hours a day limit, it can continue to finish the batch the next day without re-setup. Similarly, if the setup of a workstation cannot be completed by the end of day, due to the eight hours a day limit, the setup can be continued the next day. Assuming the workstations are 100% utilized after setup, determine the least number of workstations needed to meet the estimated demand. Turf-Rider, Inc., manufactures touring bikes and mountain bikes in a variety of frame sizes, colors, and component combinations. Identical bicycles are always produced at a batch size of 100 units. The projected demand, batch size, and time standards for each workstation are shown in the table below. Item Demand forecast Batch size Standard processing time Standard setup time Touring Bikes 5000 units/year 100 units 0.25 hours/unit/workstation 2.0 hours/batch/station Mountain Bikes 10000 units/year 100 units 0.5 hours/unit/workstation 3.0 hours/batch/station The shop currently works eight hours a day, five days a week, 50 weeks a year. It needs to decide at least how many workstations to procure so that they can meet the expected demand without using overtime. Assume that workstations work in parallel (which implies that each bicycle only needs to be worked by one workstation), and each workstation can produce one bicycle in the time shown in the table. Also assume that the stations need to be setup before producing a batch of either bike model. However, if the workstation cannot complete the production of the whole batch of one bike model by the end of the day, due to the eight hours a day limit, it can continue to finish the batch the next day without re-setup. Similarly, if the setup of a workstation cannot be completed by the end of day, due to the eight hours a day limit, the setup can be continued the next day. Assuming the workstations are 100% utilized after setup, determine the least number of workstations needed to meet the estimated demand.
Expert Answer:
Answer rating: 100% (QA)
To determine the least number of workstations needed to meet the estimated demand we need to calcula... View the full answer
Related Book For
Operations Management Processes and Supply Chains
ISBN: 978-0132807395
10th edition
Authors: Lee J. Krajewski, Larry P. Ritzman, Manoj K. Malhotra
Posted Date:
Students also viewed these mathematics questions
-
Tuft Rider. Inc. manufactures touring bikes and mountain bikes in a variety of frame sizes, colors, and component combinations. Identical bicycles are produced in lots of 100. The projected demand,...
-
Tuff-Rider, Inc., manufactures touring bikes and mountain bikes in a variety of frame sizes, colors, and component combinations. Identical bicycles are produced in lots of 100. The projected demand,...
-
QUESTION 17 The moment of a force about a pivot point is; a. The force multiplied by the perpendicular distance fro the pivot point to the direction of the force b. the distance from the pivot to the...
-
Let T: be the linear transformation that reflects each point through the x2-axis. Make two sketches similar to Fig. 6 that illustrate properties (i) and (ii) of a linear transformation. R2 R2
-
Jones Company is planning to issue $490,000 of 9%, five-year bonds payable to borrow for a major expansion. The owner, Shane Jones, asks your advice on some related matters. Requirements 1. Answer...
-
A golf pro wanted to learn the relation between the club-head speed of a golf-club (measured in miles per hour) and the distance the ball travels. He realized that there are other variables besides...
-
Carnival Corporation has recently placed into service some of the largest cruise ships in the world. One of these ships, the Carnival Dream, can hold up to 3,600 passengers and cost $750 million to...
-
If then A-1 = A = - -600 0 4 0 0 08
-
Write a paper on the Impact of culture on organizational wellbeing
-
What are the mechanisms underlying the antimicrobial properties of halogens, and could you provide specific examples of their applications in various contexts?
-
The fast food restaurant industry in a large city would be an example of which market modelZero economic profits mean that the firm is earning, revenues that are equal to its accounting profits as...
-
Could you agree/disagree and add more information regarding the below statement? "Investment banking is useful and important because it helps companies or individuals make financial decisions. These...
-
Locate a current article relating to I nvestment Banking The article should be current within the last 2 years. 1. Provide an overview of Investment banking 2. Provide one thorough example of...
-
A well-known convenience store chain aims to "offer its customers the goods they want, wherever and whenever they want them." Under this premise, the company began to develop structures that would...
-
Respond that the following statements are TRUE or FALSE: 1) When a manufacturing company uses standard costing system the Work-in-Process account records all transactions at standard cost amounts. 2)...
-
Modify the counter from Exercise 5.44 such that the counter will either increment by 4 or load a new 32-bit value, D, on each clock edge, depending on a control signal Load. When Load = 1, the...
-
Let \(\left\{X_{n}ight\}_{n=1}^{\infty}\) be a sequence of random variables such that for each \(n \in \mathbb{N}\), \(X_{n}\) has a \(\operatorname{GAmma}\left(\alpha_{n}, \beta_{n}ight)\)...
-
Let \(\left\{X_{n}ight\}_{n=1}^{\infty}\) be a sequence of random variables where for each \(n \in \mathbb{N}, X_{n}\) has an BERNoulli \(\left[\frac{1}{2}+(n+2)^{-1}ight]\) distribution, and let...
-
Suppose that \(\left\{F_{n}ight\}_{n=1}^{\infty}\) is a sequence of distribution functions such that \[\lim _{n ightarrow \infty} F_{n}(x)=F(x)\] for all \(x \in \mathbb{R}\) for some function...
Study smarter with the SolutionInn App