Question: Two highways connect an origin - destination pair, having performance functions of t 1 = 5 + 4 ( x 1 c 1 ) and

Two highways connect an origin-destination pair, having performance functions of t1=5+4(x1c1) and t2=4+5(x2c2) for routes 1 and 2, respectively. For the performance functions, the t's are in minutes and the flows (x's) and capacities (c's) are in thousands of vehicles per hour. The total traffic demand for the two highways is 4000 vehicles during the peak hour. Initially, the capacities of routes 1 and 2 are 3500vehh and 4600vehh, respectively. A construction project is planned that will cut the capacity of route 2 by 2100vehg. How much additional vehicle-hours of travel time will be added to the system assuming userequalibrium conditions hold?
 Two highways connect an origin-destination pair, having performance functions of t1=5+4(x1c1)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

To solve this problem we need to calculate the additional vehiclehours of travel time due to the reduction in capacity on route 2 considering user equ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!