Question: Two highways connect an origin - destination pair, having performance functions of t 1 = 5 + 4 ( x 1 c 1 ) and

Two highways connect an origin-destination pair, having performance functions of t1=5+4(x1c1) and t2=4+5(x2c2) for routes 1 and 2, respectively. For the performance functions, the t's are in minutes and the flows ((:x's} and capacities (c's) are in thousands of vehicles per hour. The total traffic demand for the two highways is 4000 vehicles during the peak hour. Initially, the capacities of routes 1 and 2 are 3500vehh and 4600vehh, respectively. A construction project is planned that will cut the capacity of route 2 by 2100vehg. How much additional vehicle-hours of travel time will be added to the system assuming userequalibrium conditions hold?
55.3
77.6
503.0
525.3
 Two highways connect an origin-destination pair, having performance functions of t1=5+4(x1c1)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!