Question: Two jobs must be processed through a five - machine shop. The processing times are shown below. The routing of the jobs are as follows:

Two jobs must be processed through a five-machine shop. The processing times are shown
below. The routing of the jobs are as follows:
J1=>M4,M5,M1,M3,M2
J2=>M5,M4,M2,M3,M2
a)(20 points) Using the graphical approach, find the minimum makespan schedule, and
interpret it. What is the value of Cmrx?(Solving by other methods will not be evaluated))
b)(5 points) Calculate the total waiting times of J1 and J2.