Question: Two processes in a manufacturing line are performed manually: operation A and operation B. A random sample of 50 different assemblies using operation A shows

Two processes in a manufacturing line are performed manually: operation A and operation B. A random sample of 50 different assemblies using operation A shows that the sample average time per assembly is 8.05 minutes, with a population standard deviation of 1.36 minutes. A random sample of 38 different assemblies using operation B shows that the sample average time per assembly is 7.26 minutes, with a population standard deviation of 1.06 minutes. For alpha = 0.10, the test statistics (z-value) would be _____. (Specify your answer to the 2nd decimal.)