Question: Two processes in a manufacturing line are performed manually: operation A and operation B. A random sample of 50 different assemblies using operation A shows
Two processes in a manufacturing line are performed manually: operation A and operation B. A random sample of 50 different assemblies using operation A shows that the sample average time per assembly is 8.05 minutes, with a population standard deviation of 1.36 minutes. A random sample of 38 different assemblies using operation B shows that the sample average time per assembly is 7.26 minutes, with a population standard deviation of 1.06 minutes. For α = .10, is there enough evidence in these samples to declare that operation A takes significantly longer to perform than operation B?
Step by Step Solution
3.40 Rating (175 Votes )
There are 3 Steps involved in it
A B 1 805 2 726 1 136 2 106 n 1 50 n 2 38 H o ... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
243-M-S-S-I (266).docx
120 KBs Word File
