Question: Two trains, A and B, are running on parallel tracks in the same direction. Train A is 400 meters long and runs at a

Two trains, A and B, are running on parallel tracks in the same direction. Train A is 400 meters long and runs at a speed of 72 km/h. Train B is 300 meters long and runs at a speed of 54 km/h. How long will it take for Train A to completely overtake Train B, and what is the distance covered by both Train A and Train B during this time? A. 1.33 min; 2.5 km; 2.1 km B. 2.33 min; 2.5 km; 2.1 km C. 1.33 min; 2.8 km; 2.1 km D. 2.33 min; 2.8 km; 2.1 km
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
