Question: Type or paste question here 5) [40 points total] A Navy ship is being renovated; a special highly volatile epoxy paint coating is being used

Type or paste question here 5) [40 points total]Type or paste question here 5) [40 points total]Type or paste question here

5) [40 points total] A Navy ship is being renovated; a special highly volatile epoxy paint coating is being used to paint the engine and control room ceilings, walls, and floors. The extreme fumes and stickiness of this paint, combined with the closed, minimally ventilated interior of the ship, will require the contractor to rent specialized ventilated paint suits. These are difficult to source and expensive to rent. Further, the painters have to be specially certified to work with this particular paint in order for the manufacturer's warranty not to bevoid. Theneed to allow the coatings to harden overnight, and for air to be exchanged, limits workers to eight hour shifts. Activities over the next two weeks are shown in the in the table below, which is accompanied by a punctuated-task network diagram for this part of the project. The contractor would like to rent a maximum of 5 suits. Preceeded By B D B(3) 4 D[2) 4 D 4 6 H7 8 7 7 10 11 | 12 Suits Rea 4 Legend: Alt)Sik ESEF LS LF Alt) - Activity (time) A Task A A B C D E F Duration 3 3 3 2 3 3 Z A A) A(3) 13 1 1 13 E G G(2) O 13 14 13 14 4 5 1 1 4 3 A B C E D.F C C(3) 4 4 0 6 6 F F130 1012 10 12 E[3) | 9 9 7 9 L7 G A) [15 points] Use the space below to create the preliminary resource loading chart corresponding to the network diagram and table above. (Note: there is a companion excel file posted to blackboard with leveling "tickets that you may wish to utilize and then paste back here). B) [5 points] Given the resource loadings you derived in part A), can the contractor rent just five suits? Explain. Ans: C) [20 POINTS] Using the following heuristic set as a guide, level the resource requirements until to contractors' request to order only five suits can be achieved. When there are several possible configurations, move resources to activities such that: 1. Splits are to be avoided 2. Most egregious imbalances are addressed first 3. Activities with smallest amount of slack receive priority 4. Activities with greatest number of successor tasks receive priority 5. Smallest duration (shortest) tasks receive priority 6. Lowest ID number (FCFS) tasks receive priority 7. Tasks requiring the most resource receive priority Use the templates provided in the companion excel file to document your leveling process. Paste the results below. Note - five templates are provided - you may or may not need them all. If you need more, make copies

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!