Question: UneDrive ubes > Question 2 (6 pts) A production process at GG manufacturing company is shown in the figure below. The drilling operation occurs separately

UneDrive ubes > Question 2 (6 pts) A production
UneDrive ubes > Question 2 (6 pts) A production process at GG manufacturing company is shown in the figure below. The drilling operation occurs separately from, and simultaneously with sawing and sanding, which are Independent and sequential operations. The sawing, the drilling and the assembly stations includes all parallel lines. 1) Which operation is the bottleneck? 2) What is the throughput time? 3) How many units can be produced during one week? (consider that on week is 5 working days with 8 working hours per day) 2 Sawing 6 units/h Sanding 4 units/h Sanding 4 units/h Wilding 3 units/h Assembly 2 units/h Assembly 2 units/h Assembly 2 units Drilling 2.5 units Drilling 2.5 units

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!