Question: Unit Cost Estimation An industrial project uses CSI 33 41 13.40. 1,000 L.F. of 18-inch diameter 16 gauge corrugated metal pipe and 500 L.F.

Unit Cost Estimation An industrial project uses CSI 33 41 13.40. 1,000

 

Unit Cost Estimation An industrial project uses CSI 33 41 13.40. 1,000 L.F. of 18-inch diameter 16 gauge corrugated metal pipe and 500 L.F. of 24-inch diameter 14 gauge corrugated metal pipe need to be installed. You are a subcontractor supplying the contractor with a crew of B-14 and need to develop a detailed estimate for the bid that will be submitted in 5 days. a) Duration (crew days) for 18 inch pipe: