Question: URGENT ( 1 2 points ) You are assigned the task of determining the number of machines assigned to a worker in a manufacturing line.

URGENT
(12 points) You are assigned the task of determining the number of machines assigned to a
worker in a manufacturing line. It takes the worker 2 min to walk in between each machine
and then 10 min to load each machine. Once loaded the machine takes 20 min to process the
loaded part. The cost to run each machine is $30hr. Each worker earns $12hr. How many
machines should be assigned to each worker?