Question: URGENT, PLS SOLVE WITHIN ONE HOURS (c) ABCD Industries has the jobs awaiting processing in three machines; lathe, milling and drilling. Processing time at each

URGENT, PLS SOLVE WITHIN ONE HOURS

URGENT, PLS SOLVE WITHIN ONE HOURS (c) ABCD

(c) ABCD Industries has the jobs awaiting processing in three machines; lathe, milling and drilling. Processing time at each of the work centers is shown in the following Table Q2(e). Table Q2(c): Processing time at each machine Job Machine 1 2 3 4 5 Lathe 12 15 7 23 14 Milling 6 7 4 12 7 Drilling 9 18 10 26 11 (i) Develop the best schedule for the supervisor that will minimize the makespan of the five jobs. (17 marks) (ii) Determine the total length of time of this optimal solution. (1 mark) (iii) Determine the type of manufacturing system process for this scheduling. (1 mark) (c) ABCD Industries has the jobs awaiting processing in three machines; lathe, milling and drilling. Processing time at each of the work centers is shown in the following Table Q2(e). Table Q2(c): Processing time at each machine Job Machine 1 2 3 4 5 Lathe 12 15 7 23 14 Milling 6 7 4 12 7 Drilling 9 18 10 26 11 (i) Develop the best schedule for the supervisor that will minimize the makespan of the five jobs. (17 marks) (ii) Determine the total length of time of this optimal solution. (1 mark) (iii) Determine the type of manufacturing system process for this scheduling. (1 mark)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!