Question: URGENT READ CAREFULLY !! please solve usint Cplex please dont solve with any othet method i dont want to waste my question (no excel or

URGENT READ CAREFULLY !! please solve usint Cplex please dont solve with any othet method i dont want to waste my question (no excel or any other method PLEASE!!!)
and please provide me with details for the codes so i can try it my self, please show deatils for every single step
URGENT READ CAREFULLY !! please solve usint Cplex please dont solve with

Using Cplex and utilizing the TUPLE, solve the following: 1. Toolco has contracted with AutoMate to supply their automotive discount stores with wrenches and chisels. AutoMate's weekly demand consists of at least 1500 wrenches and 1200 chisels. Toolco cannot produce all the requested units with its present one-shift ca- pacity and must use overtime and possibly subcontract with other tool shops. The result is an increase in the production cost per unit, as shown in the following table Market de mand restricts the ratio of chisels to wrenches to at least 2:1. Tool Wrenches Production type Regular Overtime Subcontracting Regular Overtime Subcontracting Weekly production range (units) 0-550 551-800 801-00 0-620 621-900 901-00 Unit cost (5) 2.00 2.80 3.00 2.10 3.20 4.20 Chisel (a) Formulate the problem as a linear program, and determine the optimum production schedule for each tool

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!