Question: use arena simulation Question 1 14 Points A single machine is designed to produce three parts (A, B, and C). Each part will have its

use arena simulation
Question 1 14 Points A single machine is designed to produce three parts (A, B, and C). Each part will have its own independent arrival pattern but all parts will follow a UNIF(17,34) min. The processing for parts are Expo(3), Expo(6), and 3+Expo(9) for parts A, B, and Crespectively. After each part is processed, there is a chance that the part needs to be reworked, rework probability is 12%. When the parts go back to the machine for reprocessing, they all will require 50% of their processing time. Before sending a part for rework, if the number of parts waiting in the queue in front of the machine is greater than 3, all parts will be send to a secondary machine (outside the bounds of this model) and get processed there. Run the 10 replications of the system for 10 days, (24 hours/day). All units are in minutes. SELECT THE CORRECT ANSWERS ONLY: A The waiting time for part types A is not different from C B The waiting time at the single machine is less than 20 min The utilization for the machine is higher than 80% but lesser than 85%. D The average number of parts leaving the system for the second machine is less than 55 parts E The system's throughput is more than 8 parts per hour F The minimum number of "Assign Modules" needed to create this model is 4 G The maximum number of times a part goes through rework is between 1-2 times H The total time (regardless of the part type) is less than 26 minutes Question 1 14 Points A single machine is designed to produce three parts (A, B, and C). Each part will have its own independent arrival pattern but all parts will follow a UNIF(17,34) min. The processing for parts are Expo(3), Expo(6), and 3+Expo(9) for parts A, B, and Crespectively. After each part is processed, there is a chance that the part needs to be reworked, rework probability is 12%. When the parts go back to the machine for reprocessing, they all will require 50% of their processing time. Before sending a part for rework, if the number of parts waiting in the queue in front of the machine is greater than 3, all parts will be send to a secondary machine (outside the bounds of this model) and get processed there. Run the 10 replications of the system for 10 days, (24 hours/day). All units are in minutes. SELECT THE CORRECT ANSWERS ONLY: A The waiting time for part types A is not different from C B The waiting time at the single machine is less than 20 min The utilization for the machine is higher than 80% but lesser than 85%. D The average number of parts leaving the system for the second machine is less than 55 parts E The system's throughput is more than 8 parts per hour F The minimum number of "Assign Modules" needed to create this model is 4 G The maximum number of times a part goes through rework is between 1-2 times H The total time (regardless of the part type) is less than 26 minutesStep by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
