Question: use Cocomo Model To solve The Question . Q2: Consider a new project with an estimated 250,000 LOC for a system that must be developed.
Q2: Consider a new project with an estimated 250,000 LOC for a system that must be developed. The cost drivers: virtual machine experience (VEXP) (1.21), analyst capability (ACAP) (0.71), required turnaround time (TURN) (1.15), memory constraints (1.56), software reliability (RELY) (1.40), product complexity (CPLX) (1.15) and all other cost drivers as nominal. Estimate the effort and time that is required to develop project in person/month for different phases. Perform step wise calculations. Q2: Consider a new project with an estimated 250,000 LOC for a system that must be developed. The cost drivers: virtual machine experience (VEXP) (1.21), analyst capability (ACAP) (0.71), required turnaround time (TURN) (1.15), memory constraints (1.56), software reliability (RELY) (1.40), product complexity (CPLX) (1.15) and all other cost drivers as nominal. Estimate the effort and time that is required to develop project in person/month for different phases. Perform step wise calculations
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts