Question: Use FLEXSIM to build simulation models. as described below If the daily demands of products A, B and C are 1200-1500, 1000-1300 and 700-1000, respectively,
Use FLEXSIM to build simulation models. as described below If the daily demands of products A, B and C are 1200-1500, 1000-1300 and 700-1000, respectively, considering the following information, how many products of each type should be produced to make maximal profits.
- The processing time of product A on machines 1, 3 and 4 are U(25,35), U(100,120) and U(30,35). The processing time of product B on machines 2, 3 and 4 are U(20,30), U(100,130) and U(20,35). The processing time of product C on machines 1, 2, 3 and 4 are U(30,45), U(25,40), U(120,150) and U(30,35). The inter-arrival times of products A, B and C are U(25,35), U(30,40) and U(40,45). There is a setup time of U(10,20) before the first product of the same type is processed.Besides, the setup task needs an operator to perform. The walking speed of an operator is 0.5m/s.
- Products arrive in batches. Also, the number of each batch is between 20~30. The types of products have to be different in consecutive batches.
- Machine 3 processes products in batches. The number of each batch is 30.
- Except for machine 3, the others process products one by one.
- The distance between machine 3 and machine 4 is about 20 meters. Products have to be transported by a forklift or a conveyor. The speed of a forklift is 1m/s and that of conveyor is 1m/s as well. However, a forklift needs an operator to transport products in batches of 10 and the loading/unloading is 10s/5s. There is no loading/unloading for a conveyor.
The prices of related items are as follows.
| Item | Price |
| Product A | $10 |
| Product B | $12 |
| Product C | $20 |
| Machine 1 | $100,000 |
| Machine 2 | $150,000 |
| Machine 3 | $500,000 |
| Machine 4 | $120,000 |
| Forklift | $50,000 |
| Conveyor | $150,000 |
| Operator | $1,000/day/per person |
- How many days does your model approximately reach the break-even point?
- Describe advantages and disadvantages of your model.
- If only one operator is hired, what does your model look like?