Question: Use the extended bottleneck model to solve the previous problem with the following number of parts in the system: a ) N = 5 parts;

Use the extended bottleneck model to solve the previous problem with the following number of parts in the system:
a)N=5 parts; b)N=10 parts.
Also determine the manufacturing lead time for the two cases of N in (a) and (b)