Question: Using Excel, build a critical path analysis table for each type of structure (Wood Frame and BONE). The information in the table and notes below

Using Excel, build a critical path analysis table for each type of structure (Wood Frame and BONE). The information in the table and notes below define the two processes. Create in Excel and use the formula in column P. Please provide answer in Excel.

Using Excel, build a critical path analysis table for each type ofstructure (Wood Frame and BONE). The information in the table and notes

P7 X V fx =MAX(B7:07) A B C D E F G H I J K L M N O P Q Critical Path Method Wood Frame Project 7 2 Order Site Work Framing & Install 12 13 1 Order Doors Interior and 5 Roof Doors and 8 Rough- 10 11 Interior Exterior 14 Activity Permitting and Windows Finishes Foundation Slab Work Trusses Windows Roofing In Insulation Drywall Finishes Finishes Landscaping Predecessor Activity Duration - Wood Frame Time to Early Start [ES] Complete Early Finish [EF] 0 Successor Activity [SA] Late Start [LS] 0 Late Finish [LF] 1 Slack Critical Activities 14 BONE Project Order 4 5 Install 10 11 12 1 Order Doors Interior Install BONE Slab Doors and 7 Rough- 9 Interior Exterior Landscap 6 Activity Permitting and Windows Finishes Structure Work Windows Roofing In Drywall Finishes Finishes ing 7 Predecessor Activity 8 Duration - BONE Time to 9 Early Start [ES] Complete Early Finish [EF] 0 1 Successor Activity [SA] Late Start [LS] Late Finish [LF] 4 Slack Critical Activities 6Structu re Type Wood Frame BONE Immediate Duration Duration Activity Predecessor\" ** (days) (days) City Government 1 Permits 13 13 ProCurement Orderfdellvery lead time: doors 1 57 57 and windows -Orde-r/de-||yery lead time: 6 48 48 Interior finishes (countertops) Construction 4 Site work and foundation 1 45 5 Slab 4 8 45 6 Framing and trusses\" 5 70 3* 7 Install doors and windows 2,6 9 7 8 Roofing 6 25 5 9 Rough-in\" 6 14'\" 7'\" 10 Insulation 9 11 * 11 Drywall 10 11 11 12 Interior finishes 3,11 101 101 13 Exterior finishes 7,8 85 85 14 Landscaping 13 42 42 Notes: * A BONE structure includes frame, roof panels, and insulation, and can be assembled on site in an estimated 3 days. ** At the rough-in stage, the basic electrical, plumbing, and HVAC lines are laid in, without making final conncections to interior fixtures. \"* Using a BONE structure changes the precedence constraints as well as the activity durations. The dimensional accuracy of the BONE structure eliminates the precedence constraint that interior finishes (countertops) must be ordered after framing; instead, interior finishes can be ordered immediately after obtaining a building permit. With BONE, the slab is poured after installation of the BONE structure (the order of activities 5 and 6 are reversed). The slab must be completed before any of the following activities can occur: installation of dorrs, windows, plumbing, electricals, HVAC, and roofing

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!