Using Johnson's rule for 2-machine scheduling, the sequence is:
For the schedule developed using Johnson's rule, the total length of time taken to complete
the six jobs (including the 2 nd operation)=
hours (enter your response as a
whole number).
Six jobs are to be processed through a two-step operation. The first operation
involves sanding, and the second involves painting. Processing times are
as follows: