Question: Using the attached network diagram for project 2 , what is the minimum additional cost if the desired duration is 1 2 weeks and which

Using the attached network diagram for project 2, what is the minimum
additional cost if the desired duration is 12 weeks and which tasks will
be crashed (current duration is 15 weeks)? I suggest using the method
shown in class