Question: Using the Birchmere Plan and ( RH - 1 6 8 Engineer Floor PDF ) , complete the following quantity take - off items FOOTING
Using the Birchmere Plan and RH Engineer Floor PDF complete the following quantity
takeoff items
FOOTING
LF of Continuous Footing include across garage doors
Width and Depth of footing called for in plan
Determine LF Center Line for Foundation incl garage doors
Required CY of concrete waste; No steps
Required CY of concrete strip footing w waste; with PIERS
Foundation:
tall foundation, base row of CMU and balance CMU
CMU w waste All block on inside of porch are
CMU w waste
On RH Plan:
Full Piers are concrete supporting a x CMU pier CMU
blocks per row, block lower than foundation wall
Half piers are x x concrete supporting a single CMU placed
against outer foundation to support dropped girder block lower than foundation wall
Number of full piers
Number of piers
CMU required for piers
MORTAR and SAND
Mortar required bags waste
Sand required Tons waste round up to even tons
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock