Question: Using the BOM shown below, A 3 weeks B (4) C (3) 2 weeks D (2) 2 weeks 1 week E (3) 3.3 weeks F(3)

Using the BOM shown below, A 3 weeks B (4) C (3)

Using the BOM shown below, A 3 weeks B (4) C (3) 2 weeks D (2) 2 weeks 1 week E (3) 3.3 weeks F(3) 4.3 weeks C(4) 2 weeks E (1) 3.3 weeks What is the cumulative lead time for end item A? (Round your answer to 1 decimal place.) Cumulative lead time weeks